Kargılık 24 MW Hydropower Plant, Türkiye

The Kargılık 24 MW Hydropower Plant, Turkey, is a low-impact hydropower project located in Kahramanmaraş province, south-eastern Anatolia. Total installed capacity of this greenfield project is 24 MWe, consisting of 2 turbines with an estimated net power supply to the grid of 71,000 MWh per annum, corresponding to an annual emission reduction of 43,717 t carbon-dioxide. The project is in implementation since April 2005. This renewable energy project is developed according to the VCS 2007.1 voluntary standard.

It helps reducing greenhouse gas emissions stemming from fossil fuel combustion and fighting global warming. It reduces carbon dioxide emissions by partially substituting the electricity supply of fossil fuel fired power plants in Turkey. The purpose of this voluntary emission reduction project is to generate power in an efficient, clean, reliable and sustainable way with utmost respect on social and environmental reflections. It makes use of the water flow of the Keşiş River to generate electricity from this renewable source and feeds it to the national grid.

Location Map

Andırın, Kahramanmaraş
Türkiye

Our Contribution to
Sustainable Development

Tektug Enerji invests mainly in renewable energy projects in the less-developed regions of Turkey. As a project owner we have planted 4,900 trees at the project area voluntarily (mostly almond and chestnut saplings).

"The project has created new jobs during construction and operation. I am living in the nearby Bulgurkaya Village and we benefit from the project. We did not face with any adverse environmental impact and the local community supports the project."
Muzaffer Çeribaş, Tractor Operator

Project Highlights

Installed Capacity 2 x 12 MW
Location South-Eastern Anatolia, Turkey
Type Grid Connected Hydropower Plant
Electricity Generation from Renewable Sources
Standard Voluntary Emission Reduction Project
Voluntary Carbon Standard (VCS) 2007.1
Verified Emissions (VCUs) 2008 Vintage:34,556 t CO2-eq
Project Owner Tektug Elektrik Uretim A.S.
Carbon Consultant Mavi Consultants
Greenhouse Gas Targeted CO2

Benefits

The project contributes to local sustainable development by:

  • Replacing fossil fuel consumption, associated CO2 emissions and air pollutants
  • Providing various employment opportunities (both during construction and operation) to local people
  • Developing local economy by purchasing land from local land owners with premium prices
  • Improving electricity supply quality in the region
  • Providing various voluntary benefits to local communities
  • Technical training to employees
  • Know how and technology transfer to a less-developed region, where income per capita is lower than the country averages.

Tech Tip
In order to view and print PDF files you need the Adobe Acrobat software. Adobe distributes a free viewer called Acrobat Reader that enables one to view these documents. Download the Acrobat Reader for FREE from the Adobe Web site.

Mavi Consultants
Voluntary Emission Reduction Project
Kargılık 24 MW Hydropower Plant, Türkiye
Project Description

Download  (PDF, 2.1 Mb)

Mavi Consultants
Voluntary Emission Reduction Project
Monitoring Report

Download  (PDF, 2.1 Mb)

Newsletter

© Tektuğ Elektrik Üretim A.Ş. 2010   |   Legal Terms