Follow Us

Contact

Head office
Tektuğ Elektrik Üretim A.Ş. Atatürk Bulv. 89/3 27010 Gaziantep / TÜRKİYE
Telefon
T: +90 (342) 230 29 05-06-07
F: +90 (342) 231 10 72

Proje Detayları

Erkenek HES – 13 MW

Operated by Tektuğ Elektrik Üretim A.Ş., the Erkenek HPP is located on the Karanlıkdere Stream within the borders of the Gölbaşı District in Adıyaman Province. The Erkenek HPP project was constructed with infrastructure components, including a regulator structure, a 4,000-meter transmission channel, a 1,632-meter transmission tunnel, a loading pool, a 626-meter pressure pipe, and the power plant building. It became operational on February 26, 2009.

The planned annual production of Erkenek HPP is set at 52,880 MWh. Additionally, as part of the afforestation efforts conducted on the project site, 15,000 acacia trees and 1,000 pine trees have been planted to contribute to environmental sustainability. This environmental initiative highlights the project's positive impact on ecological balance.

Our Contribution to Sustainable Development

Tektug Energy establishes renewable energy projects in Turkey's underdeveloped regions. In the Cankara village road of Gölbaşı District, Adıyaman Province, our company added two more openings to the existing four-span bridge to alleviate floodwaters.

We have also provided construction assistance in the village mosque, including rebar, sand, and cement, and constructed a Village Guesthouse. In the region, 15,000 acacia trees, 1,000 pine trees, and 500 pomegranate trees have been planted.

Project Details

Erkenek HES
Photo Gallery

Project Details

Erkenek HES - 13 MW

Project Status
Yürürlükte
Installed Power
13 MW
Turbine Type
Yatay Francis
Year of Construction
2009
Project Location
Adıyaman ili, Gölbaşı ilçesi - Karanlıkdere Çayı
Annual Production
2020 - 48.304 kWh 2021 - 25.113 kWh 2022 - 29.027 kWh
en_USEnglish