Erkenek HES – 13 MW
Operated by Tektuğ Elektrik Üretim A.Ş., the Erkenek HPP is located on the Karanlıkdere Stream within the borders of the Gölbaşı District in Adıyaman Province. The Erkenek HPP project was constructed with infrastructure components, including a regulator structure, a 4,000-meter transmission channel, a 1,632-meter transmission tunnel, a loading pool, a 626-meter pressure pipe, and the power plant building. It became operational on February 26, 2009.
The planned annual production of Erkenek HPP is set at 52,880 MWh. Additionally, as part of the afforestation efforts conducted on the project site, 15,000 acacia trees and 1,000 pine trees have been planted to contribute to environmental sustainability. This environmental initiative highlights the project's positive impact on ecological balance.
Our Contribution to Sustainable Development
Tektug Energy establishes renewable energy projects in Turkey's underdeveloped regions. In the Cankara village road of Gölbaşı District, Adıyaman Province, our company added two more openings to the existing four-span bridge to alleviate floodwaters.
We have also provided construction assistance in the village mosque, including rebar, sand, and cement, and constructed a Village Guesthouse. In the region, 15,000 acacia trees, 1,000 pine trees, and 500 pomegranate trees have been planted.
Project Details