Follow Us

Contact

Head office
Tektuğ Elektrik Üretim A.Ş. Atatürk Bulv. 89/3 27010 Gaziantep / TÜRKİYE
Telefon
T: +90 (342) 230 29 05-06-07
F: +90 (342) 231 10 72

Proje Detayları

Sincik RES – 27,5 MW

The Sincik Wind Power Plant is located in the Sincik District of Adıyaman and is operated by Tektuğ Electricity. Following an application made in November 2007, the project received a production license from the Energy Market Regulatory Authority (EPDK) on October 2, 2010. This project is one of the first to obtain a license for electricity generation from wind energy in Turkey.

Construction of the project began in March 2012, utilizing 11 Nordex wind turbines. The Sincik Basin 154 kV transformer served as the connection point for the project, and the construction of the facility was successfully completed, with operations commencing in January 2014. The project has an installed capacity of 25 MWe, which can meet the daily electricity needs of approximately 15,463 residents in Adıyaman.

Additionally, a hybrid solar energy project has been initiated at the Sincik WPP site, with a solar plant investment of 9.8489 MWm capacity. Through these projects, Sincik WPP contributes to environmentally friendly electricity generation by harnessing both wind and solar energy.

Project Details

Sincik RES
Photo Gallery

Project Details

Sincik RES - 27,5 MW

Project Status
Yürürlükte
Installed Power
27,5 MW
Turbine Type
Nordex GmbH / N100 - 2,5 MW
Year of Construction
2014
Project Location
Adıyaman ili, Sincik ilçesi
Annual Production
2020 - 47.468 kWh 2021 - 52.820 kWh 2022 - 50.201 kWh
en_USEnglish