Kalealtı II HES – 14,24 MW

The Kalealtı II HPP Project, under Tektuğ Elektrik Üretim A.Ş., is located on the Savrun Stream, a tributary of the Ceyhan River in the Mediterranean Region. This project, situated near Kalealtı II Neighborhood in the Kadirli District of Osmaniye Province, has seen significant contributions from our sister organization, Çiltuğ Isı San. ve Tic. A.Ş.

Construction activities for the Kalealtı II HPP project began in April 2011 after obtaining the necessary permits. The project includes the successful completion of the regulator structure, a 2,512-meter transmission tunnel, a 452-meter transmission channel, a loading pool, a 650-meter pressure pipe, and the power plant building. The plant was commissioned in March 2014.

Project Details

Kalealtı II HES
Photo Gallery

Project Details

Kalealtı II HES - 14,24 MW

Project Status
Yürürlükte
Installed Power
14,24 MW
Turbine Type
Yatay Francis
Year of Construction
2014
Project Location
Savrun Stream, Kadirli, Osmaniye
Annual Production
2020 - 35.659 kWh 2021 - 25.874 kWh 2022 - 31.520 kWh