Follow Us

Contact

Head office
Tektuğ Elektrik Üretim A.Ş. Atatürk Bulv. 89/3 27010 Gaziantep / TÜRKİYE
Telefon
T: +90 (342) 230 29 05-06-07
F: +90 (342) 231 10 72

Proje Detayları

Sırımtaş HES – 28 MW

The Sırımtaş HPP project is located on the Birimşe Stream within the borders of the Sincik District in Adıyaman Province. The foundation of the project was laid with the production license obtained on April 1, 2009. Following the acquisition of the necessary permits, construction activities commenced in May 2010. The project involves the construction of a reservoir area with a volume of 33,863,512 m³, a 4,557-meter transmission channel, a loading pool, a 719-meter pressure pipe, and the power plant building. The completion of the facility was finalized in December 2013, and it was commissioned for operation.

Project Details

Sırımtaş HES
Photo Gallery

Project Details

Sırımtaş HES - 28 MW

Project Status
Yürürlükte
Installed Power
28 MW
Turbine Type
Yatay Francis
Year of Construction
2013
Project Location
Adıyaman ili, Sincik ilçesi - Birimşe Çayı
Annual Production
2020 - 69.875 kWh 2021 - 32.019 kWh 2022 - 49.800 kWh
en_USEnglish