Information of the project

Kalealtı HES – 15 MW

The Kalealtı HPP project is established on the Savrun Stream within the borders of Kösepınarı Village, Kadirli District, Osmaniye Province. A production license for the project was obtained on July 10, 2003, and construction activities included a regulator structure, a 916-meter transmission tunnel, a 1,400-meter transmission canal, a loading pool, an 844-meter pressure pipe, and the power plant building. These works were successfully completed, and the facility was commissioned on November 30, 2006, after receiving temporary acceptance from the ministry.

As part of the project, 5,500 pomegranate trees were planted in the area, contributing positively to the project's environmental sustainability. The Kalealtı HPP project effectively utilizes natural resources to produce energy while maintaining ecological balance.

Our Contribution to Sustainable Development

Tektug Energy establishes renewable energy projects in Turkey's underdeveloped regions. The project owner has voluntarily planted 5,500 trees in the area, and the maintenance is managed by a local gardening team.

Project Details

Kalealtı HES
Photo Gallery

Project Details

Kalealtı HES - 15 MW

Project Status
Yürürlükte
Installed Power
15 MW
Turbine Type
Yatay Farncis
Year of Construction
2006
Project Location
Savrun Stream, Kadirli, Osmaniye
Annual Production
2020 - 49.269 kWh 2021 - 37.352 kWh 2022 - 45.098 kWh